Scope of works and variation approval form

Resources · Construction and trades

Scope of works template and variation approval form, so a change gets priced before it gets built.

A signed scope of works and a one-page variation form. Together they answer the complaint that turns up most often in NZ trade reviews: the number on the invoice was not the number that was agreed.

Preview of the Scope of works and variation approval form from ClearLogic Intelligence

What is a variation order, and why does every job need a form for it?

A variation is any change to the agreed scope, whether the client asks for it or the site forces it. A variation order records what changed, why, what it costs and whether the finish date moves, and it is signed before the work starts. Without one, the change gets done on a verbal okay and priced from memory at invoice time. In our trades corpus, overcharging is the single most common complaint theme in negative reviews (about 7% of both plumbers’ and electricians’ negative reviews), and in construction, quote accuracy is praised in only 12.9 to 13.9% of positive reviews. A written scope and a signed variation are the two documents that close that gap.

Where it fails in practice

The job this document is doing.

  • —A scope that lists trades (“framing, roofing”) instead of finished outcomes a client can tick off
  • —An extra agreed on site on Tuesday, remembered differently by Friday
  • —A variation priced after the work is done, so the client has no choice but to argue
  • —Credits for removed work never written down, so the final invoice looks wrong even when it is right
What is in it

Open it and use it today.

  • 01Scope of works: site and conditions assumed, included work by stage with a “finished when” column, specific exclusions, standards and finish, and how changes are handled
  • 02Two blank variation approval forms (print as many as the job needs)
  • 03Each form: description, reason checklist, cost breakdown with margin and credits, time impact, client and contractor approval

Free to use and adapt for your own business. Not legal advice: check contract terms against your own terms of trade and, where it matters, with a lawyer.

The evidence

Why this document, and not another one.

CorpusFigureWhat it measures
NZ plumbersAbout 7% of negative reviewsOvercharging, the top complaint theme
NZ electriciansAbout 7% of negative reviewsOvercharging, the top complaint theme
NZ builders13.9% of positive reviewsQuote accuracy praised
NZ outdoor and civil construction12.9% of positive reviewsQuote accuracy praised
NZ builders1.4 pointsQuality scores above value, on average

Trades figures from 20,286 publicly posted reviews of 369 NZ electricians, plumbers and painters; construction figures from 13,567 reviews of 328 builders and outdoor and civil contractors. Negative reviews score under 50 on any dimension; the trades negative samples are small (56 to 167 reviews) and are reported as rank order, not precision. Full corpus, method and thresholds: the construction methodology page. Full findings: the construction research study. Trades figures: trades methodology and study.

Goes with

Use it alongside

Construction quote template

A two-page NZ construction quote with the sections that stop disputes: scope by stage, allowances, written exclusions, a variations clause, payment stages and acceptance.

Open this resource →
Next step

A template fixes one document. The diagnostic finds the rest.

Seven minutes, results immediately: five pillars scored, your leaks quantified in dollars.

Start Diagnostic — $249
The Business Systems Brief

Want more like this?

Get a short read like this in your inbox every Tuesday, written for your industry, with a free template or tool in every issue. Free, and you can unsubscribe in one click.

Which industries do you want to hear about? Pick as many as you like.